Safety Recommendation H-88-014
Details
Synopsis: ON APRIL 5, 1987, TWO OF THE FIVE SPANS OF THE NEW YORK STATE THRUWAY (I-90) BRIDGE OVER THE SCHOHARIE CREEK FELL ABOUT 80 FEET INTO A RAIN-SWOLLEN CREEK AFTER PIER 3, WHICH PARTIALLY SUPPORTED THE TWO SPANS, COLLAPSED. NINETY MINUTES AFTER THE INITIAL COLLAPSE, PIER 2 AND A THIRD SPAN COLLAPSED. FOUR PASSENGER CARS AND ONE TRACTOR-SEMITRAILER PLUNGED INTO THE CREEK, AND 10 PERSONS WERE FATALLY INJURED.
Recommendation: THE NTSB RECOMMENDS THAT THE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS: PROVIDE SPECIFIC GUIDANCE ON MAINTENANCE OF FOUNDATIONS OF BRIDGES THAT ARE DEPENDENT UPON RIPRAP FOR SCOUR PROTECTION TO SPECIFY THAT FOLLOWING EACH INSPECTION THE RIPRAP BE REPLENISHED TO MEET THE DESIGN SPECIFICATIONS.
Original recommendation transmittal letter: PDF
Overall Status: Closed - Acceptable Action
Mode: Highway
Location: Amsterdam, NY, United States
Is Reiterated: No
Is Hazmat: No
Is NPRM: No
Accident #: DCA87MH005
Accident Reports: Collapse of New York Thruway (I-90) Bridge over the Schoharie Creek
Report #: HAR-88-02
Accident Date: 4/5/1987
Issue Date: 6/8/1988
Date Closed: 5/12/1992
Addressee(s) and Addressee Status: American Association of State Highway and Transportation Officials (Closed - Acceptable Action)
Keyword(s):

Safety Recommendation History
From: NTSB
To: American Association of State Highway and Transportation Officials
Date: 5/12/1992
Response: Safety Recommendation H-88-14 asked the AASHTO to provide specific guidance on maintenance of foundations of bridges that are dependent upon riprap for scour protection to specify that following each inspection the riprap be replenished to meet the design specifications. The Safety Board understands that the AASHTO Subcommittee on Maintenance has issued a new page 160 to the Manual for Bridqe Maintenance. According to paragraph two of page 160, a thorough scour evaluation must be conducted in order to adequately evaluate the size of stone required at bridge crossings. Therefore, the Safety Board assumes that following each inspection and thorough scour evaluate the size of stone required at bridge crossings. Therefore, the Safety Board assumes that following each inspection and thorough scour evaluation of bridge foundations that are dependent upon riprap for scour protection, the riprap will be replenished to meet the design specifications. Based on this information, Safety Recommendation H-88-14 has been classified as 'Closed--Acceptable Action.'

From: American Association of State Highway and Transportation Officials
To: NTSB
Date: 1/2/1992
Response: BASED UPON THE RECOMMENDATIONS OF THE SUBCOMMITTEE, WE HAVE ISSUED A NEW PAGE 160 TO THE "MANUAL" WHICH ELIMINATES THE CHART AND RECOMMENDS A THOROUGH SCOUR EVALUATION. THIS CHANGE WAS BALLOTED THROUGH THE SUBCOMMITTEE, THE STANDING COMMITTEE ON HIGHWAYS AND THE EXECUTIVE COMMITTEE. THE NEW PAGE HAS BEEN SENT TO ALL MEMBER DEPTS. AND HAS BEEN INSERTED IN ALL THE "MANUALS" IN OUR INVENTORY.

From: NTSB
To: American Association of State Highway and Transportation Officials
Date: 8/19/1988
Response: We appreciate the information that Safety Recommendations H-88-14 and -15 have been referred to the AASHTO Highway Subcommittee on Maintenance We look forward ,to receiving a further response from your office. In the meantime, H-88-14 and -15 will be classified as "Open--Acceptable Action."

From: American Association of State Highway and Transportation Officials
To: NTSB
Date: 8/2/1988
Response: RECOMMENDATIONS H-88-14 AND H-88-15 HAVE BEEN REFERRED TO THE HIGHWAY SUBCOMMITTEE ON MAINTENANCE WHICH HAS SIMILAR RESPONSIBILITIES WITH RESPECT TO BRIDGE MAINTENANCE MANUAL.