Synopsis: ABOUT 11:55 ON 3/23/94, A 36-INCH DIAMETER PIPELINE OWNED & OPERATED BY TEXAS EASTERN TRANSMISSION CORPORTION (TETCO) RUPTURED CATASTROPHICALLY IN EDISON TOWNSHIP, NEW JERSEY, WITHIN AN ASPHALT PLANT COMPOUND. THE FORCE OF THE RUPTURE & OF NATURAL GAS ESCAPING AT A PRESSURE OF ABOUT 970 PSIG (POUNDS PER SQUARE INCH GUAGE) EXCAVATED THE SOIL AROUND THE PIPE & BLEW GAS HUNDREDS OF FEET INTO THE AIR, PROPELLING PIPE FRAGMENTS, ROCKS, & DEBRIS MORE THAN 800 FEET. WITHIN 1 TO 2 MINUTES OF THE RUPTURE, ONE OF SEVERAL POSSIBLE SOURCES IGNITED THE ESCAPING GAS, SENDING FLAMES UPWARD 400 TO 500 FEET IN THE AIR. HEAT RADIATING FROM THE MASSIVE FIRE IGNITED THE ROOFS OF SEVERAL BUILDING ROOFS IN A NEARBY APARTMENT COMPLEX. OCCUPANTS, ALERTED TO THE EMERGENCY BY NOISES FROM ESCAPING GAS & ROCKS HITTING THE ROOFS, FLED FROM THE BURNING BUILDINGS. APPROXIMATELY 1,500 APARTMENT RESIDENTS WERE EVACUATED. MIRACULOUSLY, NO DEATHS DIRECTLY RESULTED FROM THE RUPTURE & RESULTING FIRE. MOST INJURIES WERE MINOR FOOT BURNS & CUTS THAT THE APARTMENT RESIDENTS SUSTAINED FROM THE HOT PAVEMENT & GLASS SHARDS AS THEY FLED THE COMPLEX. DAMAGE FROM THE ACCIDENT EXCEEDED &25 MILLION.
Recommendation: THE NTSB RECOMMENDS THAT THE TEXAS EASTERN TRANSMISSION CORPORATION: REQUIRE PILOTS TO DOCUMENT ALL PATROL OBSERVATIONS OF EXCAVATION ACTIVITY ADJACENT TO YOUR PIPELINES, NOTING SEPCIFICALLY EXCAVATION ACTIVITIES WITHIN INDUSTRIAL PROPERTIES, & REQUIRE THAT THE PILOT'S REPORT BE ATTACHED OR REFERENCED IN CORRELATIVE REPORTS DOCUMENTING ANY RESPONSE TAKEN.
Original recommendation transmittal letter: PDF
Overall Status: Closed - Acceptable Action
Mode: Pipeline
Location: Edison, NJ, United States
Is Reiterated: No
Is Hazmat: No
Is NPRM: No
Accident #: DCA94MP001
Accident Reports:
Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire
Report #: PAR-95-01
Accident Date: 3/23/1994
Issue Date: 2/7/1995
Date Closed: 7/3/1995
Addressee(s) and Addressee Status: Texas Eastern Gas Pipeline Corporation (Closed - Acceptable Action)
Keyword(s):

Safety Recommendation History
From: NTSB
To: Texas Eastern Gas Pipeline Corporation
Date: 7/3/1995
Response: THE BOARD UNDERSTANDS THAT TEXAS EASTERN HAS MODIFIED ITS PROCEDURES TO INCORPORATE THIS RECOMMENDATION. THE BOARD WOULD APPRECIATE RECEIVING A COPY OF THE REVISED PROCEDURES. P-95-6 HAS BEEN CLASSIFIED "CLOSED--ACCEPTABLE ACTION."

From: Texas Eastern Gas Pipeline Corporation
To: NTSB
Date: 4/5/1995
Response: TEXAS EASTERN'S PROCEDURES TO INCORPORATE THIS RECOMMENDATION. TEXAS EASTERN'S PROCEDURES HAVE BEEN MODIFIED TO SPECIFICALLY NOTE ACTIVITIES WITHIN INDUSTRIAL PROPERTIES, & REQUIRE THAT THE PILOT'S REPORT BE REFERENCED IN CORRELATIVE REPORTS DOCUMENTING ANY RESPONSE TAKEN.