Safety Recommendation P-98-031
Details
Synopsis: ABOUT 11:54 P.M EASTERN DAYLIGHT TIME ON 6/26/96, A 36-INCH-DIAMETER COLONIAL PIPELINE COMPANY PIPELINE RUPTURED WHERE A CORRODED SECTION OF THE PIPELINE CROSSED THE REEDY RIVER AT FORK SHOALS, SOUTH CAROLINA. THE RUPTURE PIPELINE RELEASED ABOUT 957,600 GALLONS OF FUEL OIL INTO THE REEDY RIVER & SURROUNDING AREAS. THE ESTIMATED COST TO COLONIAL FOR CLEANUP & SETTLEMENT WITH THE STATE OF SOUTH CAROLINA WAS $20.5 MILLION. NO ONE WAS INJURED IN THE ACCIDENT.
Recommendation: THE NTSB RECOMMENDS THAT THE COLONIAL PIPELINE COMPANY: DEVELOP & IMPLEMENT MANAGEMENT PROCEDURE REQUIRING THAT PROPER ENGINEERING OR HYDRAULIC EVALUATION & ANALYSIS BE PERFORMED BEFORE CHANGS ARE MADE TO LINE OPERATING PARAMETERS THAT HAVE BEEN SET BY COMPANY MANAGEMENT.
Original recommendation transmittal letter: PDF
Overall Status: Closed - Acceptable Action
Mode: Pipeline
Location: Fork Shoals, SC, United States
Is Reiterated: No
Is Hazmat: No
Is NPRM: No
Accident #: DCA96MP005
Accident Reports:
Pipeline Rupture and Release of Fuel Oil in the Reedy River
Report #: PAR-98-01
Accident Date: 6/26/1996
Issue Date: 11/18/1998
Date Closed: 1/9/2001
Addressee(s) and Addressee Status: Colonial Pipeline Company (Closed - Acceptable Action)
Keyword(s):

Safety Recommendation History
From: NTSB
To: Colonial Pipeline Company
Date: 1/9/2001
Response: The Safety Board is pleased to learn that Colonial has developed and implemented management policies and procedures that address this recommendation, as described in Mr. Scott’s letter. These include the procedures for implementing a temporary pressure restriction due to a potential safety-related condition, procedure for implementing a permanent change to the system operating pressure limits manual, the management of change policy, and the maintenance procedures for pipeline integrity. Accordingly, Safety Recommendation P-98-31 is classified “Closed—Acceptable Action.”

From: Colonial Pipeline Company
To: NTSB
Date: 10/3/2000
Response: Letter Mail Controlled 10/10/2000 4:20:45 PM MC# 2001516 Colonial has developed and implemented management procedures requiring that proper engineering or hydraulic evaluation and analysis be performed before changes are made to line operating parameters that have been set by company management.

From: NTSB
To: Colonial Pipeline Company
Date: 7/17/2000
Response: TO DATE THERE HAS BEEN NO RESPONSE TO P-98-31 THROUGH -33. THE SAFETY BOARD WOULD APPRECIATE LEARNING WHAT ACTION COLONIAL HAS TAKEN TO IMPLEMENT THESE RECOMMENDATIONS.