WASHINGTON (March 16, 2023) — A deteriorated bollard led to a mobile offshore drilling unit breaking away and colliding with a cargo vessel in Pascagoula, Mississippi last year. The breakaway resulted in nearly $5 million in damages.
On March 12, 2022, the mobile offshore drilling unit VALARIS DS-16 was at the ST Engineering Halter Marine and Offshore Shipyard (STEHMO) when it broke away from the dock during the passage of a cold front, drifted across the Bayou Casotte channel and collided with the bulk cargo vessel Akti. No injuries or pollution were reported.
The vessel’s mooring lines were placed on six bollards on the pier at the STEHMO Shipyard. During strong winds of 30-40 knots, one of the bollards broke free at its base and was pulled off the pier into the water. The snapped bollard secured the VALARIS DS-16’s four bow lines and a semisubmersible rig’s two stern lines.
Ultrasonic thickness tests performed after the breakaway indicated there was deteriorated steel at the lower portion of several bollards. Several bollards also showed signs of external corrosion and wastage. In addition, all of the bollards used by the VALARIS DS-16 were modified from the original 1997 design, and vertical components were added to each of the bollards to accommodate more lines.
The NTSB determined the probable cause of the breakaway and subsequent collision with the cargo vessel was the failure of one of the shipyard’s mooring bollards—which had been modified to increase its height to accommodate more lines—used to secure the VALARIS DS-16’s bow mooring lines to a pier, during a cold front with strong winds.
The STEHMO Shipyard has replaced 10 of the 14 bollards on the pier, with plans to replace an eleventh bollard by the end of March 2023. Shipyard managers have begun evaluating the safe working load of the new bollards and are scheduling a pull test using a tugboat.
“As a result of continuing increases in vessel size and sail area, bollards that were previously sufficient may not have adequate capacity to moor larger vessels,” the report said. “There are currently no U.S. Coast Guard or Occupational Safety and Health Administration regulatory requirements for facilities to inspect and verify loading capacities of bollards at shoreside facilities. Bollards and associated pierside mooring equipment are vital equipment that must be capable of withstanding the tremendous forces that large vessels exert on them. Due to their exposure to seawater, bollards and associated pierside mooring equipment are at high risk for corrosion, which can significantly affect service life. The Coast Guard has recommended that facility owners and operators develop a routine inspection program for bollards and other mooring equipment.”
Marine Investigation Report 23-05 is available online.
To report an incident/accident or if you are a public safety agency, please call 1-844-373-9922 or 202-314-6290 to speak to a Watch Officer at the NTSB Response Operations Center (ROC) in Washington, DC (24/7).